Floating foundation CAPEX refresh | Commercial-scale FOW development
A leading offshore wind developer needed an updated cost model ahead of a competitive floating offshore wind tender – one that reflected real supply chain movements, macroeconomic changes, and refined technical assumptions since their previous analysis.
Credit: Magenta Renewables
Our approach
Magenta Renewables provided new data points through targeted consultation with key fabricators and suppliers combined with in-house market intelligence.
These data inputs were fed into our proprietary FOW substructure CAPEX model to generate bespoke costs for steel and concrete floating foundations; covering fabrication, assembly, and logistics through to load-out.
Costs were modelled across multiple design and supply scenarios, and validated against top-down benchmarking from recent FOW projects.
Outcome
The client received a fully refreshed CAPEX stack for foundations and moorings, with cost levers clearly mapped to their target market and procurement strategy. The analysis clarified their technology options and supported their bid strategy.